STAGE 3 | NORTH BUILDING

2-2 Kaguro Minami, Inzai City, Chiba

 
    • Completion in February 2019
    • 122,600 sqm of modern, multi-customer logistics space
    • Four-stories with truck berths on all floors accessed by separate up and down ramps
    • Flexible design and specification to meet customers’ requirements including custom racking, material handling systems and cold/chilled storage
    • Exceptionally high level of finish and employee amenity, including a roof-top terrace offering a captivating view of Goodman Business Park and the surrounding area, providing an outdoor urban oasis for employees to collaborate and socialize or refresh and recharge
    • High efficiency, long life, low operating cost LED lighting
    • Roof top solar panels

SPACE+

37,100 tsubo of modern logistics space available with separate up and down ramp access to berths on all floors

  • Ceiling height of 5.5 metres floor to beam
  • Floor loading capacity: 1.5 tonnes / sqm (2nd to 4th floor)  | 2 tonnes / sqm (1st floor)