stage 2 | South Building

1-3 Kaguro Minami, Inzai City, Chiba

Development of Stage 2 comprising a modern and high quality logistics facility has completed

  • Completed in January 2018
  • 125,000 sqm of modern, multi-customer logistics space
  • Four-stories with truck berths on all floors accessed by separate up and down ramps
  • Flexible design and specification to meet customers’ requirements including custom racking, material handling systems and cold/chilled storage
  • Exceptionally high level of finish and employee amenity, including a roof-top terrace offering a captivating view of Goodman Business Park and the surrounding area, providing an outdoor urban oasis for employees to collaborate and socialize or refresh and recharge
  • Super high voltage electricity available 
  • High efficiency, long life, low operating cost LED lighting
  • Roof top solar panels
  • Fully leased to high quality global customers

SPACE+

37,830 tsubo of modern logistics space available with separate up and down ramp access to berths on all floors

  • Ceiling height of 5.5 metres floor to beam
  • Floor loading capacity of 1.5 tonnes / sqm